More Ways to Connect
  LinkedIn Twitter YouTube Instagram
  RSS
Search
News
Kettering Laboratory
PHOTOS: 
1

Kettering Laboratory
Back Next
Publish Date: 06/27/13
Media Contact: AHC Public Relations, (513) 558-4553
print
PDF download
RSS feed
related news
share this
Kettering Work Will Require HVAC Shutdown Saturday, June 29

The renovation project in the Kettering complex will require a shutdown of all the heating, ventilating and air conditioning (HVAC) units in the complex except for the LAMS unit from 7 a.m. to 7 p.m. Saturday, June 29. There will not be any temperature control or ventilation air during this period.

If you have questions, please contact Doug Newell at 513-558-2617. 



 back to list | back to top