More Ways to Connect
  LinkedIn Twitter YouTube Instagram
  RSS
Search
News
Kettering Laboratory
PHOTOS: 
1

Kettering Laboratory
Back Next
Publish Date: 01/13/14
Media Contact: AHC Public Relations, (513) 558-4553
print
PDF download
RSS feed
related news
share this
Portions of Kettering Lab Remain Without Normal Power

The North and Mid wings at Kettering Lab remain without normal power, Maintenance and Operations said today (Monday, Jan. 13, 2014), as a result of water damage to electrical equipment related to last week's frigid temperatures.

The damaged equipment cannot be repaired and will have to be replaced, which will take at least two weeks, officials said.

Repairs have been made to the emergency generator that is providing emergency lighting to the Mid-Wing.  Work is also underway on temporary wiring that would remove the need for the portable generator parked on the east side of Kettering. Current plans call for that generator to be shut down at 7 a.m. Tuesday, Jan. 14.

Kettering Lab is home to the environmental health department.

If you have questions, please call Kenneth Bloomer at 513-556-0605.









 back to list | back to top