More Ways to Connect
  LinkedIn Twitter YouTube Instagram
  RSS
Search
News
CARE/Crawley Atrium
PHOTOS: 
1

CARE/Crawley Atrium
Back Next
Publish Date: 02/20/15
Media Contact: AHC Public Relations, (513) 558-4553
print
PDF download
RSS feed
related news
share this
Repair Work Will Limit MSB/CARE Access Saturday, Feb. 28

Contractors will be at the Medical Sciences Building Saturday, Feb. 28, 2105, to replace the broken office window that faces the Atrium - Room 2005F. (This work was originally scheduled for Saturday, Feb. 21, but was rescheduled.)

The contractors will also be replacing glass panels on two of the CARE/MSB bridges. The work will begin at 7 a.m. and should end by 5 p.m. 

There will be no access to the Atrium area, connecting bridges, Health Sciences Library on Levels G and 1 facing the Atrium, outside entrances, stairways and other possible ways to enter the construction space during this time. To gain access to labs in CARE and the Fitness Center at CARE/Crawley, enter through the exterior door near Subway and use the CARE elevators. Access to MSB from CARE or CARE exterior entry doors will not be available.

Please pay attention to routing signs and caution tape during this activity. If you have questions, call Don Becker at 513-556-4734 or Ken Bloomer at 513-556-0605.



 back to list | back to top